CIM, Braunschweig

Technologietransferzentrum - Technology Transfer Center

BGF:
3600 m2

For a building containing high-technology, a light construction with a minimal use of material was chosen over traditional or monumental techniques. Despite the differences in room height requirements of 11 m for the machine hall and 3.75 m for the laboratories, an overall cubical structure with one consistant but variable facade system was planned.

 
SCHULITZ ARCHITEKTEN